Well almost done. I still have a couple of pieces of trim to paint, but they're not in the theater proper so they don't count. Right?

This project was a lot more work than Ed or I had anticipated. He ended up rebuilding a couple of stud walls, installing a couple of ceiling heat registers, closing the existing heat register that was hidden above the ceiling tiles, adding a cold air return as one didn't exist, adding a couple of electrical outlets, fixing some of the other wiring, closing in a doorway that wasn't needed, installing new light fixtures including a removing one of those old industrial florescent fixtures as well as insulating the outside walls and drywalling the entire room. Most people won't see most of the changes but we notice the difference and I guess that's what counts.

20110803-20110722_IMG_4535.JPG
The end wall is painted "photo paper" gray which works wonderfully as the screen for the projector. The resident director Cecile DeBear approves of the changes.