News Flash - Ed Up At 6:30am

The builder told us that the backhoe guy would be at the house by 7:30 to start back-filling. Ed is putting a gas radiant heater in the worker shop, so he wanted to up and outside to ensure that the gas guy came and pipe was buried appropriately. He's also working on a interlocking brick patio and fill was going to be added to this spot at the same time. Good thing he was up at 6:30 as the workers arrived before 7:15.


After the backfilling and compacting was done, the floor was readied for the concrete pour.


Already for the cement truck.